15 Jan 2010 - Site preparation for the extension of the existing multipurpose hall. The hall will double in size and have a new stage and evaporative cooling

15 Jan 2010 - Preparation for pouring the foundations for the hall extension

15 Jan 2010 - Demolition of the back wall of the existing hall

15 Jan 2010 - The demolition of the wall from the inside

15 Jan 2010 - The rear wall of the extended hall showing the waterproofing of the blocks and drainage irrigation cells to redirect water away from the wall

15 Jan 2010 - Stockpile of the bricks that will be reused during construction

17 Feb 2010 - The existing hall after the completion of the internal demoilition works

17 Feb 2010 - The extension to the hall will double the useable floor space

17 Feb 2010 - The steelwork for the extension of the hall

17 Feb 2010 - Looking back into the hall from the hill at the rear of the school

22 Mar 2010 - The majority of the brickwork has been completed and services are now being installed

22 Mar 2010 - Ducting for the cooling and ventilation system is on site ready for installation.

22 Mar 2010 - Cabling for electrical services has commenced

22 Mar 2010 - A steel beam was installed to provided structural support for the new glazed auto doors at the main entry to the hall

22 Mar 2010 - External view of the hall from the hill

22 Mar 2010 - An external view of the building showing a side entry into the hall. Glazing will allow natural light into the hall

07 Apr 2010 - Ceiling, cooling and ventilation system installation work

07 Apr 2010 - The building will be at lock-up stage with the installation of the windows

07 Apr 2010 - Internal view of the windows and door that will provide crossflow ventilation and natural light to the hall

14 Apr 2010 - Ducting and services works in progress

14 Apr 2010 - Internal wall cladding underway

14 Apr 2010 - Completed ceiling grid and the installation of ceiling tiles has commenced

05 May 2010 - Completion of ceiling, lighting and ventilation works

05 May 2010 - New floor covering being installed

05 May 2010 - New glass sliding entrance door to the hall

05 May 2010 - The sliding door ready for curtain

03 Jun 2010 - New entry to hall from main corridor

04 Jun 2010 - A new speaker installed as part of Audio Visual System in the hall

08 Jun 2010 - New auto door entry

08 Jun 2010 - Blockout curtain has been installed

08 Jun 2010 - Data projector installed as part of Audio Visual System in the hall

08 Jun 2010 - Projection screen installed as part of Audio Visual System in the hall

08 Jun 2010 - An accessible portable stage will be installed in the hall. The hall was handed back to the school on May 17. The all external works will be completed by June 15.

08 Jun 2010 - Side doors provide natural light to the hall

15 Oct 2010 - An external view of the extended hall

15 Oct 2010 - An external view of the extended hall

15 Oct 2010 - An external view of the extended hall

15 Oct 2010 - An external view of the extended hall

15 Oct 2010 - The rear door of the extended hall

15 Oct 2010 - The internal view of the extended hall

15 Oct 2010 - Access ramp to the portable stage

15 Oct 2010 - The portable stage is on a metal frame that can fold up when it is not required

15 Oct 2010 - The portable stage is on wheels and has an electrical remote control for assembly/disassembly

15 Oct 2010 - A view of the portable stage

15 Oct 2010 - Another view of the stage

21 Jan 2011 - External view of completed hall