16 Mar 2010 - Demolition of the external portico as part of the school hall refurbishment underway

 

16 Mar 2010 - Demolition of the internal areas of the hall and canteen that will be refurbished underway

 

16 Mar 2010 - Bulk earth works commenced for the new multipurpose building

 

16 Mar 2010 - Bulk earth works completed for the new multipurpose building

 

16 Mar 2010 - Hydraulic ground works in place for the new multi purpose building

 

16 Mar 2010 - Detailed earth works commencing for the new multipurpose building

 

26 Mar 2010 - Footings complete and formwork being installed in preparation for the installation of the concrete slab for the new multipurpose building

 

26 Mar 2010 - Footings complete and formwork being installed in preparation for the installation of the concrete slab for the new multipurpose building

 

21 Apr 2010 - Formwork and reinforcing steel installed in preparation for the slab of the new multipurpose building

 

07 May 2010 - Demolition works underway in the school hall

 

07 May 2010 - Concrete slab poured for the new multipurpose building

 

14 May 2010 - Electrical rough-in complete as part of the refurbishment of the canteen as part of the school hall works

 

31 May 2010 - New benches and roller door were installed in the canteen as part of the hall refurbishment.

 

31 May 2010 - A view of the finished hall after refurbishment. This photo shows the newly extended stage, refinished floor and new audio-visual system.

 

31 May 2010 - The structural steel frame for the new multipurpose building has been completed.

 

07 Jun 2010 - Refurbishment to the portico in the hall foyer is almost complete.

 

07 Jun 2010 - Brickwork is underway on the new building.

 

07 Jun 2010 - The completed framework for a verandah adjacent to the new building.

 

18 Jun 2010 - Insulation is being installed before the roof sheeting is put on the building.

 

18 Jun 2010 - An internal view of the new multipurpose area, with wall framing underway. A track will shortly be installed for a semi-operable wall which will enable the space to be divided into two when desired.

 

18 Jun 2010 - Another view of the multipurpose space. The area to the right hand side of the photo will become a wet area and toilets.

 

28 Jun 2010 - The electrical rough-in is underway. The next stage will be the installation of wall and ceiling sheeting.

 

14 Jul 2010 - The installation of wall and ceiling sheeting is underway.

 

14 Jul 2010 - Outside the new building brick paving is being laid in the courtyard which opens from it.

 

25 Aug 2010 - Joinery is being installed in the new building. This is a science bench in the multipurpose area.

 

25 Aug 2010 - This counter top dips down to form a wide bench seat in front of a window.

 

25 Aug 2010 - A wide awning shelters the front entrance to the new building. Glass bi-fold doors will be installed in place of the temporary wooden hoardings later in the building process.

 

23 Sep 2010 - The multi-purpose space which can be used by the school or the community is being prepared for hand-over to the school. An operable wall allows this large space to be divided if desired.

 

23 Sep 2010 - A long work area for practical activities or science in the multipurpose building. The building has been completed and was handed over to the school on 6 September 2010.

 

19 Nov 2010 - IWB installation to classrooms

 

19 Nov 2010 - Multipurpose space in the new multipurpose building

 

19 Nov 2010 - Rear view of the new multipurpose building

 

19 Nov 2010 - Front entrance of the new multipurpose building

 

20 Jan 2011 - Inside the science classroom of new multipurpose building

 

20 Jan 2011 - Sliding partitions in multipurpose building.

 

20 Jan 2011 - Science room. Adjustable wall to join inside and outside learning space

 

20 Jan 2011 - Interactive whiteboard installed in multipurpose building

 

20 Jan 2011 - Address from the Principal at the Recognition Ceremony

 

20 Jan 2011 - 3rd December 2010, Andrew Leigh, Federal Member, addressing the crowd at the Recognition Ceremony