04 Jan 2010 - Site construction fence installed prior to demolition commencing

04 Jan 2010 - Internal demolition of the medical centre to create the new Multi Purpose Area

04 Jan 2010 - External demolition of the medical centre to create the new Multi Purpose Area

04 Jan 2010 - External demolition of the medical centre to create the new Multi Purpose Area

04 Jan 2010 - Demolition complete of the medical centre to create the new Multi Purpose Area_

04 Jan 2010 - Excavation for the hydraulic services

04 Jan 2010 - Hydraulic services in place to create the new Multi Purpose Area

16 Mar 2010 - Concrete slab in place for the extension of the medical facility into a multi purpose building

16 Mar 2010 - New path in installed at the front of the multipurpose building

16 Mar 2010 - Structural steel commenced for the multipurpose building

16 Mar 2010 - Structural steel in place for the multipurpose building

16 Mar 2010 - Structural steel in place for the multipurpose building

26 Mar 2010 - Structural steel erection nearing completion for the refurbishment of the medical centre into a new multipurpose building

26 Mar 2010 - Structural steel erection nearing completion for the refurbishment of the medical centre into a new multipurpose building

09 Apr 2010 - Scaffolding on new multipurpose building at Fraser Primary School

09 Apr 2010 - Installation of metal roof cladding underway

23 Apr 2010 - Covered walkway being constructed to link with existing covered walkway

14 May 2010 - Installation of duct work for heating the building

14 May 2010 - Exterior cladding on new multipurpose room with general learning areas

28 May 2010 - Insulation and ceiling sheeting is being installed in the new building.

28 May 2010 - A view of the end wall of the new multipurpose building, ready for the last external cladding to be installed. The frame visible at the front is part of the covered walkway.

08 Jun 2010 - The wall and ceiling sheeting has been completed and the multipurpose space has been prepared ready for painting.

18 Jun 2010 - New joinery is being installed in the Practical Activities Area before the room is painted.

19 Jun 2010 - This image, taken on 8 June, shows a new disabled toilet being tiled.

28 Jun 2010 - Wet area facilities inside the multipurpose space have been tiled and painted.

28 Jun 2010 - The covered walkway shown at frame stage in a previous photograph has been completed. Here it is being used to brace the formwork for wide concrete steps which will be used as an outdooor seating area. Old bitumen playground is being removed and will be replaced with new concrete.

26 Jul 2010 - An external view of the building, showing the combination of corrugated steel and coloured aluminium panels.

08 Aug 2010 - The completed new building, as seen from the existing building. A small amount of work remains to be done outside, setting coloured shapes into the concrete.

08 Aug 2010 - The completed kitchenette, which opens into the multipurpose space.

08 Aug 2010 - The school logo is etched into this glass wall looking into the office, adding visual interest.

08 Aug 2010 - A finished view of the multipurpose teaching space. The building works have been completed and the building was handed over to the school on 21 July 2010.

01 Nov 2010 - Toilet refurbishment in the existing building

01 Nov 2010 - Toilet refurbishment in the existing building

01 Nov 2010 - Toilet refurbishment in the existing building

01 Nov 2010 - Toilet refurbishment in the existing building

01 Nov 2010 - Toilet refurbishment in the existing building

01 Nov 2010 - Toilet refurbishment in the existing building

20 Jan 2011 - Steel gates provide secure access to outdoor playspace

20 Jan 2011 - Ramp access to multipurpose building completed

20 Jan 2011 - Painted concrete in courtyard area

20 Jan 2011 - Entrance to multipurpose building and terrace seating in ampitheatre

20 Jan 2011 - Water tanks installed on multipurpose building

20 Jan 2011 - Front entrance of multipurpose building

20 Jan 2011 - Wet area in multipurpose building

20 Jan 2011 - Interactive whiteboards installed into each clssroom

20 Jan 2011 - Classroom in multipurpose building, complete with kitchen for cooking classes

20 Jan 2011 - 3rd December 2011, Federal Member Andrew Leigh, and other special guests in attendance at Recognition Ceremony