Macgregor Primary P21 Project Gallery

22 Dec 2009 - The library prior to refurbishment

 

22 Dec 2009 - The internal courtyard will be covered to provide an all weather area for the students

 

22 Dec 2009 - Internal walls have been demolished to create a modern library and teaching areas

 

12 Apr 2010 - Installation of ductwork in the library area

 

12 Apr 2010 - Blinds on high level windows in the hall

 

12 Apr 2010 - View to the enclosed courtyard

 

23 Apr 2010 - Steel roof frame for the enclosed courtyard

 

23 Apr 2010 - The roof frame being lowered into place by crane

 

23 Apr 2010 - The frame in place in the courtyard, prior to the installation of the roof

 

23 Apr 2010 - The meeting room in the new library

 

23 Apr 2010 - Windows looking from the corridor into the new library

 

23 Apr 2010 - Completed Year 5 teaching area

 

23 Apr 2010 - A wall of concertina doors enables the large teaching area to be divided into two

 

28 May 2010 - Track lighting being installed. The lighting is positioned to be above the future shelving to provide good task illumination.

 

28 May 2010 - The library courtyard before the installation of Crimesafe screen.

 

28 May 2010 - In this photo, installation of Crimesafe screen is in progress around the open sides of the roof. The two darker panels are where the screen has been installed.

 

08 Jun 2010 - The library courtyard has been completed.

 

08 Jun 2010 - Furniture delivered for the new library. The shelving is still to arrive.

 

08 Jun 2010 - The new library has a resource room for storage.

 

08 Jun 2010 - Reading Room 2 in the new library.

 

08 Jun 2010 - Reading Room 3 in the new library.

 

08 Jun 2010 - Building work in the library has been completed although the shelving is still to arrive ,and the area has been handed over to the school. The library now has an enclosed courtyard, a glassed meeting room, a resource room and reading rooms. The next stage of work is the refurbishment of the old Year 6 area.

 

08 Jun 2010 - This is part of the Year 6 area that will be refurbished. A dividing wall will be removed, the wet area replaced and the area will be repainted and recarpeted.

 

21 Jun 2010 - The old Year 6 area has been gutted ready for refurbishment. The wet area seen in the previous photograph has been removed and a dividing wall has been demolished.

 

29 Jun 2010 - With much of the major work at the school now complete, minor work is being undertaken in the school hall. Storage for the hall chairs will be built, the hall is being painted, and the existing high-level windows will be modified to make them operable and provide improved flow-through ventilation.

 

29 Jun 2010 - The hall after it has been newly painted.

 

29 Jun 2010 - An image of the completed library, with the new furniture installed. The large globe at the centre of the seating area can be illuminated when it is in use.

 

29 Jun 2010 - The loans desk in the completed library. The glass walled meeting room is visible behind the desk.

 

29 Jun 2010 - Another view of the completed library. The brightly coloured seating and tables have been designed to be attractive, portable, comfortable and fun for the students to use.

 

26 Jul 2010 - Painting has been completed in the Year 6 area. New blinds have been installed on high level windows to prevent glare and cool the rooms in summer.

 

26 Jul 2010 - The new Year 6 wet area, where art and other practical activities can take place.

 

26 Jul 2010 - These large drawers in the new wet area for Year 6 were specifically designed to be able to store large sheets of art paper.