Mount Rogers Primary P21 Project Gallery
16 Mar 2010 - Floor protection and scaffolding in place in the school hall in preparation for the refurbishment
16 Mar 2010 - Floor protection and scaffolding in place in the school hall in preparation for the refurbishment work
16 Mar 2010 - Decommissioning of services and in the school hall being undertaken as part of the hall refurbishment
26 Mar 2010 - Demolition occurring on the school hall ceilings as part of the school hall upgrade works
26 Mar 2010 - Installation of the new ceiling grid and acoustic treatment going in as part of the school hall upgrade works
26 Mar 2010 - Refurbishment of the school entry corridor underway with relining of the walls and the creation of an archway and ceiling bulk head to define the entrance
26 Mar 2010 - Refurbishment of the school entry corridor underway with relining of the walls and the creation of an archway and ceiling bulk head to define the entrance
31 May 2010 - A completed refurbished classroom. Six classrooms are being refurbished as part of the building works. Two are now complete and have been handed back to the school.
07 Jun 2010 - The completed refurbished art room. New joinery has been constructed to house art supplies.
07 Jun 2010 - The school hall refurbishment is almost complete, with only the installation of clerestory windows still to be done.
07 Jun 2010 - With four classrooms now completed, work is underway stripping out the next classrooms being refurbished.
19 Jun 2010 - Painting has been finished in the last two of the six refurbished classrooms, and new joinery is being installed.
28 Jun 2010 - Another classroom completed and handed back to the school at the end of refurbishment. A computer bench runs along the far wall.
28 Jun 2010 - This is the last of six classrooms to have been fully refurbished. It has been stripped, re-lined, painted and recarpeted, and new joinery has been built and installed. It can now be put back into use by the school.
06 Jul 2010 - The last job yet to be completed in the school hall is the installation of a number of banks of clerestory windows. This is the first of the windows installed, and shows the perforated aluminium louvres which will help to keep the building cool in summer.
06 Jul 2010 - A covered shade structure has been constructed to shade an outdoor sports centre which was built last year. It will now be raised into place.
06 Jul 2010 - Another view of the covered shade structure which will be raised over the outdoor sports court.
14 Jul 2010 - The shade structure is almost complete. The minor work of hooking up the downpipes remains to be done.
14 Jul 2010 - The installation of perforated aluminium louvres to these multiple banks of hall clerestory windows is close to completion.
13 Sep 2010 - A finished classroom with Interactive White Board after it has been handed back for school use.