Aranda Primary School P21 Project Gallery

29 Mar 2010 - New disabled parking bays installed by TAMS to provide disability access to the new library

 

29 Mar 2010 - Changes to the footpath to enable disabled access to the new school library

 

29 Mar 2010 - Works underway on the new access path leading to the new school library

 

29 Mar 2010 - The completed access path to the new school library

 

29 Mar 2010 - The completed access path leading to the new school library

 

20 Apr 2010 - Site establishment in progress for the new library

 

20 Apr 2010 - Site establishment in progress for the new library

 

07 Jun 2010 - Hurdles have been put in place for the setting out of the building. As can be seen in the photograph, rainy weather has caused slight delays.

 

18 Jun 2010 - This photograph taken on 10 June shows the trenching being dug for the footings for the new building.

 

18 Jun 2010 - Reinforcement has been laid in the trenches and the concrete footings have been poured.

 

25 Jun 2010 - This image shows the plumbing that has just been installed for the student toilets. More work on inground services needs to take place before construction of the slab begins.

 

06 Jul 2010 - Steel starter bars have been drilled into the building footings ready for wall construction to begin. These steel rods serve to reinforce the blockwork. The plastic cap on each rod is to protect workers from injuring themselves on the cut rod ends.

 

26 Jul 2010 - Blockwork is proceeding on the external walls of the new building. The next stage will be the pouring of the slab.

 

08 Aug 2010 - Formwork and reinforcing mesh have been put in place ready for the concrete slab to be poured.

 

08 Aug 2010 - Concrete is being pumped into the formwork as the slab for the new library building is poured and levelled.

 

25 Aug 2010 - Erection of structural steel for the building's frame is underway. When finished, the library building will contain teaching space, reading areas, a conference area, computer room and toilet facilities. It will also feature design features to help make it environmentally sustainable, such as night purging to help maintain the building within a comfortable temperature range.

 

09 Sep 2010 - The erection of the steel frame for the building is progressing, with roof framing now in place. Work will continue on the erection of blockwork, and the next stage will be the installation of roof insulation and sheeting.

 

09 Sep 2010 - While the construction of the new library proceeds, work has also taken place to upgrade an old walkway which runs alongside the existing building. Drainage problems have been fixed and dangerous and uneven paving has been lifted and replaced.

 

23 Sep 2010 - An exterior view of the new library building shows construction of the external walls progressing rapidly.

 

23 Sep 2010 - The electrical wiring is being roughed in. This area will become the loans desk area of the library.

 

23 Sep 2010 - A close-up of the exterior walls showing the feature stripes in the brickwork which will run around the building.

 

18 Oct 2010 - External view of the new library

 

18 Oct 2010 - Ceiling installation in progress

 

19 Nov 2010 - Progress of internal wall installtion

 

19 Nov 2010 - Joinery installation in the new library

 

19 Nov 2010 - Joinery installation in the new library

 

20 Jan 2011 - Installation of joinery complete in the new library

 

20 Jan 2011 - Covered walkway to library

 

20 Jan 2011 - Rainwater tank and ventilation system installed

 

20 Jan 2011 - User-activated cisterns installed in urinals

 

20 Jan 2011 - Computer lab desks fitted with ports for cables

 

20 Jan 2011 - Common area in library with ventilation installed, portable shelves, and study areas for students

 

20 Jan 2011 - Shelves ready for books in library common area

 

20 Jan 2011 - Loans desk in Resource Centre. Wordles on glass panel

 

20 Jan 2011 - Interactive whiteboard installed in study area of library

 

14 Feb 2011 - Access ramp with handrail toward the entry of the new Resource Centre

 

14 Feb 2011 - Teaching space in the Resource Centre

 

09 Mar 2011 - The back of the new resource centre

 

09 Mar 2011 - Front entrance of the resource centre

 

09 Mar 2011 - Completion of the resource centre

 

09 Mar 2011 - The BER recognition ceremony to celebrate the completion of the resource centre

 

09 Mar 2011 - Address from the Principal at the BER Recognition Ceremony

 

23 Mar 2011 - Shade structure over multipurpose sporting court

 

23 Mar 2011 - Shade structure over multipurpose sporting court